Description
Purpose: the Production and maintenance of electric and heat energy.
Description: gas Turbine power plant, GTEU-18 is a highly efficient and reliable Assembly of a new generation. The unit can be used for Autonomous heat and water supply of small towns and a network of densely located villages, neighborhoods, factories.
The equipment is supplied to the functional blocks of full factory readiness, which provides a minimum amount of installation work and the ease of maintenance and repair. The units can be equipped with both hot water and steam boiler. At the request of the customer to ensure the independence graph of heat during the heating season provided for the use of the unit after-burning devices. While it is possible to equip the installation as hot water and steam boiler with a thermal capacity of 28 Gcal/h.
Characteristics
- Installed thermal performance, Gcal / h
- 25-48
- Annual fund of operating time of the installation, hours
- 8000
- Drive motor type
- Fuel gas consumption, nm3 / h
- 4647-6544
- Annual heat supply from GTEU, 103 Gcal / year
- 200-384
- Annual electricity supply, 106 kWh / year
- 128-200
- Fuel utilization rate,%
- 85
- Electrical efficiency (ISO),%
- 31-38
- Installed electric power, MW
- 16-25
- Working fuel
- natural gas (associated petroleum gas





