Description
Ready-to-install pump units GNG who have no mixer. They are used in systems where the coolant is fed directly with the temperature of the heat source. Pumping group "Teploforum GNG" in most cases used as the circuit for the radiator heating, but it can be used to load the DHW tank and to provide ventilation.
Package includes:
Ball shut-off valves Itap - 2 PCs.;
Thermometer - 3 PCs.;
Valve - 1 PC.;
The fastener set;
Pipeline.
Characteristics
- Material
- Structural steel
- power, kWt
- up to 270
- Connection
- Producing country
- Russia




















